Skip to content
-
Subscribe to our newsletter & never miss our best posts. Subscribe Now!
Metro & Rail News

Latest In Indian Metro & Rail Industry

Metro & Rail News

Latest In Indian Metro & Rail Industry

  • Home
  • About
  • Contact
  • Home
  • About
  • Contact
Close

Search

  • https://www.facebook.com/
  • https://twitter.com/
  • https://t.me/
  • https://www.instagram.com/
  • https://youtube.com/
Subscribe
Modern metro train arriving at a station platform
Regulation and PolicyTechnology Shifts

BMRCL seeks Pink Line tunnel trial nod

By Rohan Malhotra
November 20, 2026 2 Min Read
Comments Off on BMRCL seeks Pink Line tunnel trial nod

As per our sources, Bengaluru Metro Rail Corporation Limited (BMRCL) has asked the Commissioner of Metro Railway Safety (CMRS) for clearance to start trial runs on the underground section of the Pink Line, Moneycontrol reported on 20 November 2026. Managing director P C Jaffer told the outlet that BMRCL needs a minor sanction to remove the buffer barrier at the end of the elevated section at SG Palya, after which trials can run up to Shivajinagar. Materials for platform screen doors have been shipped for 10 of the 12 underground stations, and work at three stations is nearly complete. BMRCL is targeting May 2027 to open the underground section.

This development matters because the 7.5 km elevated stretch that Prime Minister Narendra Modi opened on 13 November carries only about 33,000 riders a day, and the line should draw far more traffic once it reaches the city centre. BMRCL also said the Railway Board has given in principle approval for Communications Based Train Control (CBTC), a signalling system that lets trains run closer together safely, on the Pink Line and the whole Blue Line up to Kempegowda International Airport.

In our expert opinion, seeking trial clearance six months before the target date is the right move, because underground sections need long testing of ventilation, signalling and platform screen doors before CMRS will approve passenger service. The weak point is the screen doors, since only three of the 12 stations are near completion and every door must be fitted and tested before opening. Earlier Namma Metro openings, including the Yellow Line, came later than first announced while safety checks and train supply caught up. We expect trial runs on the underground section to start before 31 December 2026, but we expect the May 2027 opening to slip by at least two months, because door installation and systems testing are still under way at most stations.

This is important for our readers because the Pink Line has a late night gap. If you plan a QR ticket journey that changes to the Pink Line at Jayadeva, book it before 10.45 pm, since BMRCL says no connecting trains run after that time. The last trains leave Kalena Agrahara at 10.50 pm and SG Palya at 10.54 pm, so plan your return trips around them this week.

 

 

 

Sources: Moneycontrol, 20 November 2026, moneycontrol.com.

Photo: Arjun Gk / Pexels

Image used just for representational purposes. It may, or may not, have any relevance to the story.

Tags:

BengaluruBlue LineBMRCLCommissioner of Metro Rail SafetyJayadevaKalena AgraharaKempegowda International AirportMoneycontrolNamma MetroNarendra ModiP.C. JafferPink LineRailway BoardSG PalyaShivajinagarYellow Line
Author

Rohan Malhotra

Follow Me
Other Articles
Entry gates inside a modern metro station in Mumbai
Previous

Maharashtra to rename Dadar metro station Chaityabhoomi

Next

DMRC awards Phase 5A station systems contract

Latest Updates

  • Bandra residents oppose Metro 11 site office
  • UPMRC readies four TBMs for Lucknow tunnels
  • Chennai Metro Yellow Line ticketing fails again
  • CMRL completes Kathipara balanced cantilever viaduct
  • Ashoka Buildcon leads Jaipur Metro bids
  • Sabarmati Railway Metro Station opens 28 November
  • GMDA orders faster approvals for Gurugram Metro
  • SCR builds travelator bridge to Nampally Metro
  • CMRL invites bids for Kattupakkam flyover
  • Universal MEP wins Chennai Metro station contract

Archives

  • November 2026
  • October 2026

Categories

  • Company Announcements
  • Earnings and Financials
  • Funding
  • Labor and Talent
  • Lawsuits
  • Market Data
  • Product Launches
  • Regulation and Policy
  • Supply Chain
  • Technology Shifts

Metro & Rail News is an industry specific online news portal belonging to the Avenue Publishing Network. We cover the latest in the Metro & Rail Industry in India with a perspective of how it impacts those associated with the industry.

Copyright 2026 — Metro & Rail News. All rights reserved. Blogsy WordPress Theme