Skip to content
-
Subscribe to our newsletter & never miss our best posts. Subscribe Now!
Metro & Rail News

Latest In Indian Metro & Rail Industry

Metro & Rail News

Latest In Indian Metro & Rail Industry

  • Home
  • About
  • Contact
  • Home
  • About
  • Contact
Close

Search

  • https://www.facebook.com/
  • https://twitter.com/
  • https://t.me/
  • https://www.instagram.com/
  • https://youtube.com/
Subscribe
Metro station building with a covered walkway
Company AnnouncementsTechnology Shifts

SCR builds travelator bridge to Nampally Metro

By Rohan Malhotra
November 26, 2026 2 Min Read
Comments Off on SCR builds travelator bridge to Nampally Metro

According to the latest updates, South Central Railway (SCR) is building a 220 metre foot over bridge (FOB) with travelators to link Hyderabad Deccan (Nampally) railway station with Nampally Metro station, The Hindu reported on 26 November 2026. The bridge will cost about Rs 21 crore and is part of a Rs 327 crore station redevelopment under the Amrit Station Scheme. SCR chief public relations officer A Sridhar said 10 of the planned 20 foundations are complete. The bridge will be nine metres wide, with travelators along most of its length except the curved parts.

This is significant as rail passengers will be able to reach the metro without stepping onto the busy roads below. The Nampally terminal, opened in 1907, handles around 60 trains and nearly 25,000 passengers a day, including MMTS suburban services. The link has been planned for nearly a decade.

In our expert opinion, this is a small project with large value for metro ridership, because a covered, step-free link makes it easy for long-distance and suburban rail passengers to switch to the metro. Hyderabad Metro gains new riders at low cost, and autos and cabs at the station forecourt lose some short trips. The report gives no completion date, and the demolition of the old station building shows how much wider work is still under way at the site. We expect the bridge to open to passengers no earlier than December 2027, because only half the foundations are done and the deck and travelators still need to be built and tested.

This is important for our readers because the link will change how you transfer between trains in central Hyderabad. If you use Nampally station, allow extra time this week for construction barriers around the forecourt. If you supply travelators, escalators or lifts, contact SCR about the station’s wider works, which include 16 lifts and eight escalators.

 

 

 

Sources:
The Hindu, 26 November 2026, thehindu.com.

Photo: Shantum Singh / Pexels

Image used just for representational purposes. It may, or may not, have any relevance to the story.

Tags:

A SridharAmrit Station SchemeHyderabadHyderabad DeccanHyderabad MetroMMTSNampallySouth Central Railway
Author

Rohan Malhotra

Follow Me
Other Articles
Elevated metro viaduct above a road at night
Previous

CMRL invites bids for Kattupakkam flyover

Metro train crossing an elevated bridge
Next

GMDA orders faster approvals for Gurugram Metro

Latest Updates

  • Bandra residents oppose Metro 11 site office
  • UPMRC readies four TBMs for Lucknow tunnels
  • Chennai Metro Yellow Line ticketing fails again
  • CMRL completes Kathipara balanced cantilever viaduct
  • Ashoka Buildcon leads Jaipur Metro bids
  • Sabarmati Railway Metro Station opens 28 November
  • GMDA orders faster approvals for Gurugram Metro
  • SCR builds travelator bridge to Nampally Metro
  • CMRL invites bids for Kattupakkam flyover
  • Universal MEP wins Chennai Metro station contract

Archives

  • November 2026
  • October 2026

Categories

  • Company Announcements
  • Earnings and Financials
  • Funding
  • Labor and Talent
  • Lawsuits
  • Market Data
  • Product Launches
  • Regulation and Policy
  • Supply Chain
  • Technology Shifts

Metro & Rail News is an industry specific online news portal belonging to the Avenue Publishing Network. We cover the latest in the Metro & Rail Industry in India with a perspective of how it impacts those associated with the industry.

Copyright 2026 — Metro & Rail News. All rights reserved. Blogsy WordPress Theme